Wellington Airport reviewing contingency measures in case runway extension project is rejected

18 May, 2017

Wellington Airport is reviewing "a range" of contingency measures in the event its 350m runway extension project is rejected due to the proposed 90m runway end safety area (Stuff, 17-May-2017). The airport reportedly requested quotes for an engineered materials arrestor system that aims to reduce the speed of an aircraft within a short distance.